
In 2015, a major Canadian natural gas distribution company had to perform construction operations to upgrade its existing distribution system. To mitigate the disturbance of the surface level roads and natural habitats, the proponent utilized horizontal directional drilling (HDD) technology. Twenty large bores (36" and 42") were planned for this project.